Sign up, and you'll be able to customize your font size and more! Sign up
Sep 19, 2024
12:18:34pm
byuluvr On My Way
They gutted the inside, left the outside intact, repaired and expanded the north/east wall, and painted it white.
They also added a gym to the East side. The wall needed repairs after the bus rammed it.
This message has been modified
Originally posted on Sep 19, 2024 at 12:18:34pm
Message modified by byuluvr on Sep 19, 2024 at 12:18:55pm
Message modified by byuluvr on Sep 19, 2024 at 12:21:48pm
byuluvr
Bio page
byuluvr
Joined
Oct 3, 2011
Last login
Sep 19, 2024
Total posts
42,158 (1,491 FO)
Messages
Author
Time

Posting on CougarBoard

In order to post, you will need to either sign up or log in.