Busy Weekend. Now that the outside is finished, we really were able to turn our attention inside. Friday we put up chair rail around the living room and the master bed room. Then repainted the whole thing. We still have a little painting to do. My wife wants to paint the lower part green. I guess I will adjust to that. The second time painting we rolled the paint with a roller after spraying. It seemed to help the lines that I felt were left after the first coat. Saturday I started early and finished plumbing the mainlines into the Sewer then capping off all of the open lines so that sewer smell didn't come up into the house. (We haven't filled the pee traps yet) I then put lights and flooring into the boys bathroom, then moved in the toilet from out in my flushing outhouse.
Then While my wife worked on flooring in one of the boys bedrooms, I started putting in lights and outlets. I especially liked the LED lights I put in the living room and mudroom ceilings.
Here are some pictures of some of the work we accomplished.